Highway

The traffic assignment process for the MRM is a multi-class “user equilibrium” assignment, which is a multipath procedure where vehicle trips are loaded from origin to destination through an iterative process. During each iteration, the trips for each origin-destination TAZ pair are assigned to a single shortest path along the network. The loadings from the iterations are weighted in a manner that results, at convergence, in the travel times along all paths being equal. This ensures that no driver could improve the travel time by changing the path. The MRM allows up to 250 iterations to ensure each assignment reaches the set convergence of 0.0001. As part of the assignment, the trip tables are assigned to the network.

Highway Assignment Trip Tables

The assignment process is applied separately to each of the four time periods (AM, PM, MI, NT). Then, those results are added together to generate the total daily volume on each link.

For each of the time periods, six trip assignment tables are assigned:

  1. Single-occupancy vehicles (SOV): These trips do not have access to HOT lanes.

  2. Two-person carpool vehicle trips (HOV-2): Vehicles with two persons have free access to HOT-2 express lanes (functional class 22 and 82 for access). However, no HOT-2 lanes exist in the official model, as all existing and planned express lanes are HOT-3+.

  3. Three or more-person carpool vehicle trips (HOV-3): Vehicles with three or more persons have free access to HOT-2 and HOT-3+ lanes (functional class 25 and 83 for access). HOT-3+ facilities in the model include the existing I-77 North Express Lanes, as well as the planned express lanes on I-77 South, US-74, and I-485 in build in future horizon years.

  4. Commercial vehicles: These trips do not have access to HOT lanes during assignment.

  5. Medium trucks: These trucks are assumed to have a passenger-car-equivalent (PCE) of 1.5 passenger cars when calculating congestion. These trips do not have access to HOT lanes or Peak Period Shoulder Lanes (PPSL’s, functional class 24).

  6. Heavy trucks: These trucks are assumed to have a PCE of 2.5 when calculating congestion. These trips do not have access to HOT lanes or PPSL’s.

Trip tables from three sources are brought together for the assignment. The mode choice program designates single-occupancy vehicle (SOV) and carpool (HOV-2, HOV-3+) person trips for home-based trips (HBW, HBS, HBO, SCH, HBU, JTW, ATW, NWK). Commercial vehicle, medium and heavy trucks, and external trips (EI, IE) are brought in from trip distribution. Through (EE) trips are brought in from the trip generation step.

Internal Trips

Carpool trips are divided into 2 person carpools and 3 or more person carpools during mode choice. The number of 3+ carpools must be “assigned” an average number of persons per car. An average 3+ carpool size is calculated for each trip purpose based on the 2023 household travel survey .

Purpose Number of Persons
HBW 3.560 persons
HBO 3.560 persons
HBU 3.360 persons
HBSch 3.560 persons
HBS 3.560 persons
ATW 3.660 persons

HOT Assignment

The HOT assignment module is run after the normal feedback assignment process is completed. The HOT lanes modeling process is applied by time-of-day using the origin-destination matrices from the normal feedback assignment process as the base set of trips. It runs the assignment process five times for each time period (AM, PM, Midday, and Night). Travel time from each round feeds back to a skimming process that minimizes impedance for paths with or without using the HOT lanes. The new travel time is averaged with the travel time from the previous round to dampen oscillations between rounds.

After the skims are prepared, the origin-destination matrices are updated with a “Travel Time Savings” core that is used to identify the savings in travel time that are realized from using the HOT lanes. These savings are used to identify diversion based on the amount of the HOT toll and people’s willingness to pay. Following the HOT assignment, a new total assignment file (TOTASSN_HOT.bin) is created that contains the estimated link volumes. These volumes should be used in place of TOTASSN.bin for analysis and model results reporting.

Transit Assignment

Transit Assignment in the MRM takes the transit production-attraction output from the mode choice model and assigns trips to particular transit route lines (bus, rail, etc.). Transit assignment differs from the highway assignment in that it must consider the access and egress modes in addition to the path.

The MRM uses a transit assignment method created by Caliper called “Pathfinder”. The Pathfinder method can compute specific walk paths for access and egress from any origin address to any destination address and can assess the drive component for park and ride access on the highway network and will yield the single best combination of park and ride lot and transit service to the destination. To determine the best path, transit assignment travel time is monetized so that it can be combined with transit fares to yield a generalized cost. Considerations other than transit fare and walk time include drive access time (park and ride), transit route transfers, transit wait times, and timed transfers. This allows transit assignment to have sensitivity to transit fare increases, route schedule changes, and changes to the highway network that impact transit route performance.

The transit assignment model assigns eighteen production-attraction matrices, which include:

  1. Peak Premium Walk Trips: This trip table is created by adding walk-to-premium from peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  2. Peak Premium Drive Trips: This trip table is created by adding drive-to-premium trips from peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  3. Peak Premium Drop-Off Trips: This trip table is created by adding drop-to-premium trips from peak HBW (all income groups), HBO, HBU, and NHB modelsPeak Bus Walk Trips: This trip table is created by adding walk-to-bus trips from peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  4. Peak Bus Drive Trips: This trip table is created by adding drive-to-bus trips from peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  5. Peak Bus Drop-Off Trips: This trip table is created by adding drop-to-bus trips from peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  6. Off-Peak Premium Walk Trips: This trip table is created by adding walk-to-premium trips from off-peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  7. Off-Peak Premium Drive Trips: This trip table is created by adding drive-to-premium trips from off-peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  8. Off-Peak Premium Drop-Off Trips: This trip table is created by adding drop-to-premium trips from off-peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  9. Off-Peak Bus Walk Trips: This trip table is created by adding walk-to-bus trips from off-peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  10. Off-Peak Bus Drive Trips: This trip table is created by adding drive-to-bus trips from off-peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

  11. Off-Peak Bus Drop-Off Trips: This trip table is created by adding drop-to-bus trips from off-peak HBW (all income groups), HBO (all income groups), HBU, and NHB models.

External Trips

External trips consist of external-internal (EI) trips, internal-external (IE,) trips, and external-external (EE) trips. These three trip types comprise the external station counts of each facility crossing the modeling area boundary. EI trips begin outside of the modeling area and end inside of the modeling area at a TAZ. IE trips begin inside the modeling area at TAZ and end outside the modeling area. Both are captured at the external station as they exit or enter the area. Finally, EE trips, commonly referred to as through trips, both begin and end outside of the modeling area. These trips pass through the modeling area entering at one external station and exiting at another.

Using vehicle classification counts we divided the vehicles crossing the modeling area boundary at the external stations between autos, commercial vehicles, medium trucks and heavy trucks. The home survey and external roadside survey provided enough information to further divide IE and EI auto trips, respectively, into work and non-work trips from productions to attractions. However, we were not able to obtain enough information from the external roadside survey to do the same for EI trips from attractions to productions. As such, we applied the IE attraction to production proportion obtained from the home survey to the EI attraction to productions trips.

In trip distribution, IE and EI work and non-work trips are modeled as person trips rather than vehicle trips to allow for the possible inclusion in mode choice at some future date.

Volume Delay Functions

The MRM uses the commonly used Bureau of Public Roads (BPR) formula as the volume-delay function to relate link travel time to the volume/capacity ratio. The BPR formula is shown below.

The basic BPR function is expressed as:

\[ t = t_0 \times \left( 1 + \alpha \times \left( \frac{v}{c} \right)^\beta \right) \]

Where:

  • t: Travel time on the link
  • t₀: Free flow travel time
  • v: Traffic volume on the link
  • c: Capacity of the link
  • α and β: Calibration parameters, usually determined based on specific road characteristics

Different functionally classified roads are known to have different alpha and beta coefficients which describe the interaction between travel behavior, congestion, and speed on a particular corridor. ### Function Calibration Parameters

Functional Classification Area Type Lanes Alpha Beta
Freeway
1 2-3 0.83 10.00
1 1 0.7470 9.00
1 4 0.85 10.00
1 5 0.88 10.30
Expressway
2 1-3 0.83 8.00
2 4 0.83 8.00
2 5 0.8549 8.24
Class II
3 1-4 0.62 7.13
3 5 0.6386 7.3439
3 1-3 3 0.70 7.50
3 4 3 0.65 7.50
3 5 3 0.67 7.73
Major Arterial
4 1-2 1.00 5.00
4 3-4 0.60 5.00
4 5 0.68 6.85
4 3-4 3 0.65 5.50
4 5 3 0.72 7.21
Minor Arterial
5 1-2 0.75 3.00
5 3-4 0.65 4.00
5 5 0.73 4.89
5 1-2 3 0.75 2.10
5 3-4 3 0.65 4.00
5 5 3 0.77 4.85
Collector
6 1-4 0.76 3.80
6 5 0.73 3.91
6 1-4 3 0.80 4.00
6 5 3 0.82 4.12
Local
7 1-4 0.95 3.80
7 5 0.98 3.91
Ramp
8 1-4 0.79 6.65
8 5 0.8137 6.8495
8 5 3 0.81 6.85
Freeway Ramp
9 1-4 0.79 9.50
9 5 0.81 9.79
HOT2- Freeway / Toll Only Lanes
22/23 1-3 0.83 10.00
22/23 4 0.85 10.00
22/23 5 0.88 10.30
Peak Period Shoulder Lanes
24 1 0.83 10.00
24 2-3 0.62 7.13
24 4 0.85 10.00
24 5 0.88 10.30
24 2-3 3 0.70 7.50
Peak Period Shoulder Lanes
25 1 0.83 10.00
25 2-3 0.60 5.00
25 4 0.85 10.00
25 5 0.88 10.30
25 2-3 3 0.65 5.50
HOT2 & HOT3 Access
82 0.79 9.50
83 0.79 9.50